Vesgantti Twin Mattress, 10 Inch Hybrid Twin Size Mattress in a Box, Single Bed Pillow Top Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Feel

Vesgantti Twin Mattress, 10 Inch Hybrid Twin Size Mattress in a Box, Single Bed Pillow Top Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Feel

$280.48
Skip to product information
Vesgantti Twin Mattress, 10 Inch Hybrid Twin Size Mattress in a Box, Single Bed Pillow Top Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Feel

Vesgantti Twin Mattress, 10 Inch Hybrid Twin Size Mattress in a Box, Single Bed Pillow Top Mattresses, Foam and Pocket Coils Innerspring Mattresses, Pressure Relief, Medium Firm Feel

$280.48
Shipping calculated at checkout.

About This

  • 【Medium-Firm Plush Feel】- Fully expanded 74 *39*10 inch(LWH) approx. Vesgantti luxury mutilayer foam and pocket spring support systerm provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains
  • 【Individual Pocket Spring】- Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
  • 【Breathable and Healthy】- Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
  • 【Ultra Quite】- Due to the pocket spring + multilayer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
  • 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Make sure no one is stanting at the direction where the mattress is rolling out to prevent any unnecessary injury. Smaller size, easy to carry, restore in 10 seconds after unpacking, fully expanded for 72 hours. (Please note: once the mattress open and restore, it cannot be roll back again)

Overview

  • Brand : Vesgantti
  • Size : Twin
  • Product Dimensions : 74"L x 39"W x 10"Th
  • Top Style : Pillow Top
  • Cover Material : Polyester
  • Number of Layers : 8
  • Fill Material : High Density Foam
  • Special Feature : Hypoallergenic
  • Color : White
  • Coil Type : Pocketed Coil
  • Item Firmness Description Medium : Construction Type Innerspring, Foam Construction, Hybrid Construction Innerspring, Foam Construction, Hybrid Construction See more
  • : Item Firmness Description Medium
  • : Construction Type Innerspring, Foam Construction, Hybrid Construction Innerspring, Foam Construction, Hybrid Construction See more

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like