Skip to product information
Vesgantti Queen Mattresses 12 Inch Hybrid Pillow Top Queen Size Mattress in a Box, Memory Foam and Pocket Coil Innerspring Mattresses, Cooling & Silent Sleep, Pressure Relief, Medium Feel
$445.48
Shipping calculated at checkout.
About This
- Balanced Support & Comfort: Fully expanded 80*60*12 inch(L*W*H) approx. Vesgantti luxury queen mattress with muti-layer foam and pocket spring support system provides medium firm yet comfortable feel. The queen pillow top mattress with cushioning layer gently molds to your shape, offering supple, responsive relaxation. A great relief for those suffering from back and neck pain
- Zoned Individual Pocket Springs: Innovative zoned support system constructed by hundreds of stainless individually pocketed springs, each spring works independently to offer all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head); With excellent shock-absorption and resilience, the queen size mattress caters to your vertebra well, helping adjust and correct your sleeping posture
- Breathable & Safe: Featuring a soft knit cover and multi-layered foams, this mattress delivers excellent airflow to wick away sweat and moisture—keeping you comfortable and dry throughout the night; Crafted with CertiPUR-US certified foam and OEKO-TEX certified fabric, this mattress queen size is odorless, safe and durable
- Ultra Quite & Motion Isolation: Due to the individual pocket springs & multi-layer foam design, this hybrid mattress queen can effectively absorb noise and vibration; No waking from tossing and turning and no disturbance to your partner, make sure a quite and deep sleep; The queen bed mattress is compatible with various bed frames such as box spring, floor, slatted frame, bunk bed, flat platform and traditional bed
- 12 Inch Queen Mattress in a Box: The mattress arrives vacuum-sealed and neatly rolled in a compact box for easy moving into a room and set up; Simply unbox and unroll, it begins to expand in 10 seconds and please allow 72 hours for full expansion. Make sure no one is standing in the direction where the mattress is rolling out to avoid injuries (Please note: once the mattress is opened and restored, it cannot be rolled back again)
- No Worry: Vesgantti Mattress provides a 10-year-warranty. If you have any question or concern, please feel free to contact us
Overview
- Brand : Vesgantti
- Size : Queen
- Product Dimensions : 80"L x 60"W x 12"Th
- Top Style : Pillow Top
- Cover Material : Polyester Blend or Cotton
- Number of Layers : 8
- Fill Material : High Density Foam, Memory Foam
- Special Feature : Durable, Fire Retardant, Low Motion Transfer, Pressure Relief, Breathable, Quiet
- Color : White
- Coil Type : Pocketed Coil
- Item Weight 82 Pounds : Item Firmness Description Medium
- : Item Weight 82 Pounds
- : Item Firmness Description Medium
CARE & MAINTENANCE
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
SHIPPING & RETURNS
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.